Connecting the blower switch, metres and metres of electrical cable from stern to bow and back again!
3D cad designed wheel hub bearing the Century logo, for our trailer refurbishment.
Fitting the blower switch and wiring up the blower.
Fitting the blower, it’s in a tight spot!
It’s been so warm and dry in the workshop so giving Sunflower a bit of a cool down.
Re-chromed cutwater!!
3 D scan of the bow plate.
Trailer wheels looking fabulous.
Plus a very tiny visitor.
8 pm. Still here working on trailer modifications, sparks are flying!!!
Today we have done a hand held 3D scan of the cutwater.
Primer and first coat of white on the waterline.
Waterline finished and chrome work back in place, Sunflower looks amazing.
Thought we’d give the propeller a bit of a clean!!!
Masking the waterline ready for repainting, more masking tape!!
Sunflower's new copper bottom is looking amazing, another coat going on today.
Last coat finished and masking tape removed. Just need to repaint a crisp white line.
Copyright © 2022 The Lakeland Classic Boat Company - All Rights Reserved.
Powered by GoDaddy Website Builder